SETTLE CARLISLE TRIP - OCTOBER 2014
The Settle–Carlisle line (also known as the Settle and Carlisle (S&C)) is a 73-mile-long (117 km) main railway line in northern England. The route, which crosses the remote, scenic regions of the Yorkshire Dales and the North Pennines, runs between Settle Junction, on the Leeds to Morecambe line, and Carlisle, near the English-Scottish borders. The historic line was constructed in the 1870s and has several notable tunnels and viaducts such as the imposing Ribblehead.
The line is a part of the National Rail network that is managed by Network Rail. All passenger services are operated by Northern apart from those temporary diverted services (due to closures of the West Coast Main Line). Stations serve towns such as Settle in North Yorkshire, Appleby-in-Westmorland in Cumbria and small rural communities along its route.
In the 1980s, British Rail planned to close the Settle–Carlisle line. This prompted a campaign to save the line by rail groups, enthusiasts, local authorities and residents along the route. In 1989, the UK government announced the line would be saved from closure. Since then, passenger numbers have grown steadily to 1.2 million in 2012. Eight formerly closed stations have been reopened and several quarries have been reconnected to the line. It remains one of the most popular railway routes in the UK for charter trains and specials. After damage by a landslip, part of the line was closed from February 2016 to March 2017. To celebrate the reopening, the first regular mainline scheduled service in England for nearly half a century ran with a steam engine.
BACKGROUND
The Settle–Carlisle line (S&C) had its origins in railway politics; the expansion-minded Midland Railway company was locked in dispute with the rival London and North Western Railway (LNWR) over access rights to the latter’s tracks to Scotland.
The Midland's access to Scotland was via the "Little North Western" route to Ingleton. The Ingleton branch line from Ingleton to Low Gill, where it joined the Lancaster and Carlisle Railway, was under the control of the rival LNWR. Initially the routes, although physically connected at Ingleton, were not logically connected, as the LNWR and Midland could not agree on sharing the use of Ingleton station. Instead the LNWR terminated its trains at its own station at the end of Ingleton Viaduct, and Midland Railway passengers had to change into LNWR trains by means of a walk of about a mile over steep gradients between the two stations.
An agreement was reached over station access, enabling the Midland to attach through carriages to LNWR trains at Ingleton. Passengers could continue their journey north without leaving the train. The situation was not ideal, as the LNWR handled the through carriages of its rival with deliberate obstructiveness, for example attaching the coaches to slow goods trains instead of fast passenger workings.
The route through Ingleton is closed, but the major structures, Low Gill and Ingleton viaducts, remain. It was a well-engineered line suitable for express passenger running, however its potential was never realised due to the rivalry between the companies. The Midland board decided that the only solution was a separate route to Scotland. Surveying began in 1865, and in June 1866, Parliamentary approval was given to the Midland’s bill, for which Samuel Carter was solicitor. Soon after, the Overend-Gurney banking failure sparked a financial crisis in the UK. Interest rates rose sharply, several railways went bankrupt and the Midland's board, prompted by a shareholders' revolt, began to have second thoughts about a venture where the estimated cost was £2.3 million (equivalent to £210 million in 2019). As a result, in April 1869, with no work started, the company petitioned Parliament to abandon the scheme it had earlier fought for. However Parliament, under pressure from other railways which would benefit from the scheme that would cost them nothing, refused, and construction commenced in November that year.
As this date falls between the publication of the 1st Edition 1:2500 Ordnance Survey map and its 1st Revision, the impact of construction can be observed by studying those maps.
CONSTRUCTION|
The line was built by over 6,000 navvies, who worked in remote locations, enduring harsh weather conditions. Large camps were established to house the navvies, most of them Irish, with many becoming complete townships with post offices and schools. They were named Inkerman, Sebastapol and Jericho. The remains of one camp—Batty Green—where over 2,000 navvies lived and worked, can be seen near Ribblehead. The Midland Railway helped pay for scripture readers to counteract the effect of drunken violence in these isolated communities.
Click Picture to Zoom